Search Results
WtE Combustion System Case Study
Located some 40 kilometres north of Dublin, Ireland’s first waste-to-energy plant began delivering electricity to the city’s grid in November 2011. Babcock & Wilcox Renewable (B&W) provided the boiler, combustion grate, combustion control, and selective non-catalytic reduction (SNCR) system.
View Web PageCombustible Fractions of Waste-to-Energy Case Study
The Filbornaverket waste-to-energy plant in Helsingborg produces steam, district heating and electricity. The main fuel is combustible fractions of waste from households, industry and businesses. The plant uses the region’s large quantities of combustible waste to produce electricity and district heating for the local grid.
View Web PageRecovered Non-Shredding WtE Case Study
Forus 2's recovered energy is utilized for the inhabitants of Sandnes, Sola and Stavanger. Typically, shredding of waste can easily cost about 15 € per ton which is not needed with this B&W solution.
View Web PageWaste-Fired Power Plant Case Study
The Sundsvall waste-fired power plant is the first plant with B&W’s new cast water-cooled grate bars. The boiler is designed with three-vertical passes and horizontal convection part.
View Web PageWaste-Fired Boiler Line Case Study
In Europe there is an increasing market demand for technologies capable of burning waste with high heating values. In Scandinavia it is common to burn large fractions of industrial waste including demolition wood and different types of biomass. In order to meet the periodically very high heating values, B&W developed new combustion technology that can be adapted to high or fluctuating heating values.
View Web PageLikeng II: Guangzhou, China Case Study
Babcock & Wilcox Vølund’s license partner Grantop (Guangzhou Environment Protection Investment Co. Ltd.) has completed the Likeng II waste-to-energy plant in Guangzhou, China. The plant is one of the largest Chinese waste-to-energy plants and it is specifically designed for Chinese waste. This includes the waste characteristics with high moisture and low calorific value.
View Web PageWaste-to-Energy Plant Case Study
This plant will supply approximately 43 MW of heat to the district heating network in Aalborg. The efficiency is approximately 100%, and the energy produced will supply some 16,000 houses with electricity, and 30,000 houses with district heating.
View Web PageWaste-to-Energy - L90 Esbjerg Plant Case Study
B&W supplied the complete incinerator with state-of-the-art Waste-to-Energy technology which included waste crane, feed chute, feed grate and five-section combustion grate, combustion air system, auxiliary burners, ash conveyors for slag and fly ash from the boiler hoppers, feed water pumps with controls.
View Web PageSCR Temperature Control Installations
A V-Temp temperature control system has been successfully installed on utility steam boilers operating at lower loads.
View Web PageLongview Power: Maidsville, WV
Titanium® intelligent sootblowing improves performance at 700 MW plant.
View Web Page