Amager Bakke / Copenhill Case Study
Copenhagen’s state-of-the-art Amager Bakke sets new standards for environmental performance, energy efficiency and waste treatment capacity.
View Web PageBiomass Boilers WtE Case Study
Babcock & Wilcox Renewable (B&W) designed, manufactured and commissioned two biomass boilers for the Skærbækværket power plant in Denmark. The project allows the combined heating and power plant to supply approximately 60,000 households with clean and reliable district heating and electricity while reducing carbon emissions.
View Web PageMultifuel-Fired CHP Plant Case Study
Måbjergværket is the first CHP plant in Denmark to use a fuel combination consisting of waste, wood chips, straw and natural gas. Måbjergværket supplies the approx. 55.000 inhabitants of the cities of Struer and Holstebro with direct heating.
View Web PageNordforbrænding: WtE Case Study
New combined heat- and power-producing WtE line designed for burning 10 tonnes of waste per hour increases energy efficiency from 70% to 99%.
View Web PageLikeng II: Guangzhou, China Case Study
Babcock & Wilcox Vølund’s license partner Grantop (Guangzhou Environment Protection Investment Co. Ltd.) has completed the Likeng II waste-to-energy plant in Guangzhou, China. The plant is one of the largest Chinese waste-to-energy plants and it is specifically designed for Chinese waste. This includes the waste characteristics with high moisture and low calorific value.
View Web PagePalm Beach Renewable Energy Facility Case Study
Ranking as the cleanest, most efficient plant of its kind in the world, this engineered, designed, procured and constructed WtE facility reduces landfill volume by 90%.
View Web PageEnergy Recovery Facility Case Study
The plant processes local residual household, commercial and industrial waste. It generates 7.25 MW of green energy, contributing to Peterborough Council’s Blue Sky project to provide sustainable energy in a smart city environment.
View Web PageKeephills Unit 3 Case Study
Spray dryer absorber, pulse jet fabric filter and mercury control systems result in high SO2 removal efficiency and low operation and maintenance costs.
View Web PageLansing Generating Station Case Study
Circulating dry scrubber (CDS) designed, installed and integrated with fabric filter achieves SO2 removal efficiency up to 98%.
View Web PageIndustrial Waste Steam Plant Case Study
This plant is installed at the cardboard factory Örebro Kartongbruk AB, situated in Örebro, Sweden. The fuel consists partly of wet and dry fractions of waste from the cardboard factory and partly of unsorted industrial waste including plastic, wood and a fraction of uncombustible material.