Search Results

MEC – BioHeat & Power

B&W Renewable Service scope of supply for this project included project management, engineering, manufacturing, delivery, disassembly, installation, commissioning, testing and documentation for the replacement of the wet slag conveyor and grate siftings conveyor on both boiler lines 1 and 2 for the MEC waste-to-energy plant.

View Web Page

Karlskoga Energi AB

For this project, B&W Renewable Service replaced the front boiler wall and economizers 1 and 2, as well as installed a new rapping device system for cleaning of the heating surface on a waste-to-energy plant (Line 1) in Karlskoga, Sweden. Delivery included project management, construction, design, manufacture, delivery, dismantling, installation, commissioning, testing and documentation.

View Web Page

Tekniska Verken i Linköping AB

B&W Renewable Service scope of supply for this project included project management, engineering, design, purchasing, construction and documentation for onsite Inconel® cladding at boiler panel walls on an existing waste wood-fired boiler (Line 3) in Linköping, Sweden. The cladding was performed in the bottom portion of the first pass, including part of the rear, left, right and front walls.

View Web Page

Sundsvall Energi AB - Sweden

B&W Renewable Service won this project for onsite Inconel® cladding and combustion air upgrade at Korstaverket in Sundsvall, Sweden. The client also requested the possibility to increase the capacity of the boiler. We also performed a computational fluid dynamics (CFD) model and recalculated all boiler parameters.

View Web Page

SNCR Case Study

B&W Renewable helped WtE CHP plant in Sweden improve plant operations and reduce NOx and CO2 emissions.

View Web Page

Energnist Case Study

Energnist on 18-month intervals: We save three weeks every three years
Every three years, Energnist gains three weeks of operation and saves the costs of preparing for the maintenance shutdown. One and a half years between maintenance shutdowns can provide benefits if thoroughly prepared.

View Web Page

Walmart Adds Solar to Multiple Locations

The world's biggest retailer called on the Fosler Solar team when they added solar to their energy needs. The results? Almost 10 megawatts of solar added to 10 locations.

View Web Page

A Big Brand Gets a Big Upgrade

When Home Depot decided to upgrade five of its locations in the Illinois area, they called on Fosler Solar for the project. 5 Home Depots = 2 megawatts of power added.

View Web Page

Asheville Station Units 1 and 2 Wet Flue Gas Desulfurization Systems

Babcock & Wilcox’s (B&W) wet flue gas desulfurization (FGD) systems feature a combination of design components to provide a high level of reliability and removal efficiencies. These include B&W’s signature tray tower design to provide excellent gas to liquid contact and uniform flow distribution.

View Web Page

Diamonized® Feed Tubes Case Study

Premature packing wear from normal cycling caused excessive steam leaks in the sootblower feed tubes located in the boiler’s superheater. A solution was needed that would extend the life of the feed tubes and minimize maintenance.

View Web Page
1
2
3
4
5
6
7
8