IVM Eeklo
Babcock & Wilcox Renewable Service (B&W) won the order for replacement of superheaters 1, 2 and 3 and on-site Inconel® cladding in the first boiler pass of IVM’s waste-to-energy line 2 in Eeklo, Belgium.
View Web PageSUEZ Recycling and Recovery UK Ltd
In 2021, Babcock & Wilcox Renewable Service (B&W) won the order from SUEZ Recycling and Recovery UK for engineering, manufacturing, delivery and installation of new Inconel®-cladded furnace walls for the Greater Manchester Combined Authority (GMCA)-owned Thermal Recovery Facility at Raikes Lane, Bolton, England.
View Web PageLerwick Waste-to-Energy Plant
B&W Renewable Service provided upgrade design, engineering and components for an energy from waste boiler which included new Inconel®-cladded water-cooled wear zones, air-cooling system, secondary air system, new feeding hopper, and combustion control system.
View Web PageFjernvarme Fyn
B&W Renewable Service dismantled old and installed, tested and commissioned four new economizers on a waste-to-energy line at Fjernvarme Fyn.
View Web PageIVM Eeklo
B&W Renewable Service provided engineering, manufacturing, delivery, construction advisory services, commissioning, testing, operator training, and project management for new feeding systems, grates, riddlings and slag handling systems, water-cooled furnaces, combustion air system, support burners and hydraulic system for the plant’s two identical WtE lines.
View Web PageTekniska Verken i Linköping AB
Babcock & Wilcox Renewable Service replaced the panel walls at Gärstadverket P4, Sweden. Scope of delivery included project management, engineering, design, purchasing, manufacturing, delivery, disassembly, assembly/installation, testing, commissioning, trial run and documentation. The scope of work was a comprehensive replacement of the boiler panel walls.
View Web PageStockholm Exergi AB
Babcock & Wilcox Renewable Service provided detail design, engineering, procurement, manufacturing and replacement of the existing economizer at Högdalen waste-to-energy boiler in Stockholm, Sweden.
View Web PageTekniska Verken i Linköping AB
The B&W Renewable Service scope of supply included project management, engineering, design, manufacturing, delivery, disassembly, installation, commissioning, testing and documentation for conversion of an existing boiler (Line 1), from coal to biomass combustion (wood chips and waste wood). After the conversion to biomass, the boiler can deliver 93 tons of steam per hour at a steam temperature of 475 °C and pressure at 56 bar.
View Web PageVattenfall AB
The B&W Renewable Service delivery included project management, engineering, procurement, manufacturing and replacement of an economizer for a waste-to-energy boiler (Line 1) in Uppsala, Sweden. Also included in the project was to replace panel walls including cladding with Inconel® 625 on site.
View Web PageIRF
Babcock & Wilcox Renewable Service upgraded the furnace and replaced the hot water boiler at Leirvik waste-to-energy plant in the Faroe Islands. The plant dates back to 1989 and was originally designed for 2.5 tons of waste per hour. The purpose of the plant upgrade was partly to increase the capacity of the plant and to extend the service life. The capacity was raised to 3.5 t/h, 12 bar and 140 °C and is expected to extend its useful life.