Designs and Systems for Large Fossil Fuel Units Intended for Cycling Service

A.H. Rudd
Babcock & Wilcox
Barberton, Ohio

O.W. Durrant
Babcock & Wilcox
Barberton, Ohio

Presented to:
American Power Conference
Chicago, Illinois
April 29 - May 1, 1974

Abstract:

The increased emphasis on planned cycling operation of new fossil fuel fired boiler turbine generator units has placed new demands on the control of boilers during start-up and low load operation. The needs and limitations are discussed and recommendations made for boiler start-up and control systems for start-up and operation of the boiler and turbine together. 

Request Access:

Please fill out the below form to access this technical paper:

We're committed to your privacy. B&W uses the information you provide to us to contact you about our relevant content, products, and services. You may unsubscribe from these communications at any time. For more information, please review our Privacy Policy