Assessing Structural Integrity and Remaining Life of Boiler Tubing

Power plant operators looking to get the most out of their existing steam generating systems are constantly faced with the decision to “run, repair or replace” their equipment and prevent unplanned outages that impact operations. As boiler tube failure is the leading cause of unscheduled availability loss, an important preventive measure is testing boiler tubes to analyze their condition and gauge their remaining useful life.

View Web Page

Bid Evaluation Example

The example below provides a comparison between two industrial boiler bids where one bidder has a higher price but with a unit that has higher efficiency. Bid 1 guarantees 86.5% efficiency with a price of $10,400,000. Bid 2 guarantees 87.5% efficiency with a price of $11,200,000.