New technical training courses added: Check out our expanded list, including ESPs, Boiler Fundamentals and B&W Roll Wheel™ Pulverizers.

Browse now

   |   

Close

Success Stories

From The Leader in Clean Power Production Technologies

Unique Construction Approach to Refinery Boiler Refurbishment

An oil refinery in Edmonton, Alberta, Canada was experiencing boiler failures that were having a frequent and negative impact on its operations. This project showcases how the linkage of creative engineering, material supply and advanced construction planning come together to meet ambitious goals and minimize impacts to customer operations during and well after project completion.
Read More

Integrated Refinery & Petrochemical Complex (IRPC) 2

IRPC, the first fully integrated petrochemical complex in Southeast Asia, is located in an industrial area of Rayong, Thailand, with energy and sea port operations to support the area’s businesses. A subsidiary of Global Power Synergy PCL, IRPC Clean Power Company, Ltd., (IRPC CP) owns and operates a cogeneration plant that produces and sells steam and electrical power.
Read More

Industrial Boilers for Canadian Oil Sands

Alberta’s high-quality oil sands deposits are a major contributor to Canada’s economy and North America’s energy needs. Babcock & Wilcox (B&W) was selected to help advance one site’s responsible development and efficient production of its estimated 4.6 billion barrels of recoverable bitumen resource.
Read More

Prairie State Generating Company

The boilers burn coal from a mine adjacent to the power plant. Electricity produced is dedicated to supply eight Midwestern-based public power utilities serving customers across nine states. The design of these boilers was modified to adapt to the requirements of the Prairie State Energy Campus project, including a change in fuels from Powder River Basin sub-bituminous coal to Illinois bituminous coal.
Read More

Alunorte CFB Steam Generator

The steam produced by the CFB boiler, in conjunction with the existing steam generation units, will fulfill the needs of the alumina production process in a safe, reliable and efficient manner.
Read More

Tanjung Jati B Units 1 and 2

This installation of environmental equipment at the Tanjung Jati power plant includes low NOx burners, a wet FGD system and electrostatic precipitators.
Read More

AG Processing CFB Boiler

Coal-fired internal recirculation circulating fluidized-bed (IR-CFB) boiler from outlet of coal bunkers to outlet of tubular air heater.
Read More

Great River Energy Spiritwood

Combined heat and power plant will provide process steam for an adjacent malt plant and will normally generate approximately 56 MW net of electricity for the regional transmission grid.
Read More

Weston Unit 4

B&W installed DRB-4Z® low NOx burners and overfire air, a selective catalytic reduction (SCR) NOx removal system, a dry flue gas desulfurization (FGD) system, a pulse jet fabric filter particulate collector and a powdered activated carbon injection system for mercury removal.

Read More

Hawthorn Unit 5

An explosion during a maintenance outage on February 17, 1999, destroyed the original Hawthorn Unit 5 boiler. In August 1999, B&W was released to design, supply, erect and commission a complete replacement boiler on an accelerated schedule. The new boiler began generating electricity in June 2001, only 22 months from project commencement.
Read More

John W. Turk, Jr. Unit 1

Southwestern Electric Power Company
American Electric Power
Fulton, Arkansas
Read More

Millmerran Power Station Units 1 and 2

Plant Name
Millmerran Power Station
Units 1 and 2
Read More