Nordforbrænding: Hørsholm, Denmark
Waste-to-Energy Plant
The new waste-to-energy line will be based on our NextBAT® technology securing a very high energy recovery and very low emissions. The R1 value is actually more than 100% above the threshold value of 0.65. After completion of the new furnace line 5 in August 2016, the plant will produce heat and power from line 4 and 5 only and replace the existing three worn down B&W Vølund lines from 1969 and 1989. The existing furnace line 4, from 1998, will remain in operation.
The new line 5 naturally fulfills all requirements that will be presented in the coming waste incineration BREF in 2013. This is the core of our NextBAT® technology.
Nordforbrænding is located in the middle of Hørsholm, an affluent northern suburb of Copenhagen, and has been accepted by the neighbors as a good solution to waste management and energy supply.
Plant Design Data (per line) | ||
Process Parameters | Guaranteed Values* | Units |
R1 Value | 1.33 | |
Waste Capacity | 10 | t/h |
Heat Value, Lower | 12.5 | MJ/kg |
Steam Output | 43.6 | t/h |
Steam Temperature | 400 | °C |
Steam Pressure | 50 | Bar |
Gross Electric Output | 7.5 | MW |
District Heating Output | 22.9 | MW |
Boiler Outlet Flue Gas Temp. | 160 | °C |
Feed Water Temperature | 130 | °C |
Flue Gas Values** Before Cleaning |
Guaranteed Values* | Units |
NOx*** | 100 | Mg/Nm3 |
CO*** | 10 | Mg/Nm3 |
NH3*** | 5 | Mg/Nm3 |
TOC | 5 | Mg/Nm3 |
Facts: New furnace line at Nordforbrænding
Babcock and Wilcox Vølund will supply;