Search Results
Tekniska Verken i Linköping AB
The B&W Renewable Service scope of supply included project management, engineering, design, manufacturing, delivery, disassembly, installation, commissioning, testing and documentation for conversion of an existing boiler (Line 1), from coal to biomass combustion (wood chips and waste wood). After the conversion to biomass, the boiler can deliver 93 tons of steam per hour at a steam temperature of 475 °C and pressure at 56 bar.
View Web PageVattenfall AB
The B&W Renewable Service delivery included project management, engineering, procurement, manufacturing and replacement of an economizer for a waste-to-energy boiler (Line 1) in Uppsala, Sweden. Also included in the project was to replace panel walls including cladding with Inconel® 625 on site.
View Web PageTekniska Verken i Linköping AB
Babcock & Wilcox Renewable Service replaced the panel walls at Gärstadverket P4, Sweden. Scope of delivery included project management, engineering, design, purchasing, manufacturing, delivery, disassembly, assembly/installation, testing, commissioning, trial run and documentation. The scope of work was a comprehensive replacement of the boiler panel walls.
View Web PageStockholm Exergi AB
Babcock & Wilcox Renewable Service provided detail design, engineering, procurement, manufacturing and replacement of the existing economizer at Högdalen waste-to-energy boiler in Stockholm, Sweden.
View Web PageSundsvall Energi AB - Sweden
B&W Renewable Service won this project for onsite Inconel® cladding and combustion air upgrade at Korstaverket in Sundsvall, Sweden. The client also requested the possibility to increase the capacity of the boiler. We also performed a computational fluid dynamics (CFD) model and recalculated all boiler parameters.
View Web PageTekniska Verken i Linköping AB
B&W Renewable Service scope of supply for this project included project management, engineering, design, purchasing, construction and documentation for onsite Inconel® cladding at boiler panel walls on an existing waste wood-fired boiler (Line 3) in Linköping, Sweden. The cladding was performed in the bottom portion of the first pass, including part of the rear, left, right and front walls.
View Web PageKarlskoga Energi AB
For this project, B&W Renewable Service replaced the front boiler wall and economizers 1 and 2, as well as installed a new rapping device system for cleaning of the heating surface on a waste-to-energy plant (Line 1) in Karlskoga, Sweden. Delivery included project management, construction, design, manufacture, delivery, dismantling, installation, commissioning, testing and documentation.
View Web PageMEC – BioHeat & Power
B&W Renewable Service scope of supply for this project included project management, engineering, manufacturing, delivery, disassembly, installation, commissioning, testing and documentation for the replacement of the wet slag conveyor and grate siftings conveyor on both boiler lines 1 and 2 for the MEC waste-to-energy plant.
View Web PageSNCR Case Study
B&W Renewable helped WtE CHP plant in Sweden improve plant operations and reduce NOx and CO2 emissions.
View Web PageEnergnist Case Study
Energnist on 18-month intervals: We save three weeks every three years
Every three years, Energnist gains three weeks of operation and saves the costs of preparing for the maintenance shutdown. One and a half years between maintenance shutdowns can provide benefits if thoroughly prepared.