Coordinated Control Systems (CCS) enable the boiler and associated steam turbine to be controlled as a unit.

These systems allow the steam demand placed upon the boiler to be maintained within its delivery capability. Megawatt load run-back is automatically invoked upon the loss of specified vital plant equipment.

B&W will engineer, design and build a CCS to suit the plant environment. The system will control, monitor and alarm megawatt-loading and loading rates, steam flows and general boiler/turbine/generator system status. CRT-based graphical operator interfaces keep the operator constantly informed of the operating status of the boiler/turbine unit.

For more information, please contact us.